This is the back of two of the pillars. This image shows the train tracks which I have been working on attaching to the pillars for days. The train track consists of over 40’ of stainless steel bar weaving around the four pillars.
Pathways is really taking shape. Here is a detail of the first pillar where the train tracks begin with the wheels.
