ART on Water Street Bridge

The concrete bases where the sculptures will be attached were poured last week.  I’m headed out to Fitchburg tomorrow to check out the brick retaining wall being finished. 

The concrete bases where the sculptures will be attached were poured last week.  I’m headed out to Fitchburg tomorrow to check out the brick retaining wall being finished. 

Notes:

  1. artwaterstreetbridge posted this